ACWA Power completes Shuaibah 3 IWP Project for $821m

ACWA Power will be holding a 68 percent equity stake, according to a bourse filing (File)
Short Url

RIYADH: ACWA Power Co. has completed its Shuaibah 3 IWP Project with an investment cost of $821 million. 

The project is a joint venture between ACWA Power Co. and Water and Electricity Holding Co., with ACWA Power holding a 68 percent equity stake, according to a bourse filing.

The project includes construction, erection, installation, completion, testing, commissioning, insurance, ownership, operation, and maintenance of Shuaibah 3 desalination.

The project will be developed, designed, engineered, constructed, procured, tested, commissioned, and operated under a 25-year offtake contract with Saudi Water Partnership Co., the filing said.